Hangar 3 Renovations

Location : St. John’s, NFLD, Canada
Contractor : Redwood Construction
Architect : New Labs Engineering
Building Supplier : Existing Conventional
Door Size : 120ft x 28ft 36.6m x 8.5m
Door Design : 6 Blades Bi-Parting on 3 track sliding 3 Blades into door pocket on each side
Door Options : Rail Flashings, Rail Drainage, Rail Heating, Horn/Light, Dual Drives, Tail Door

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.